{"id":1221,"date":"2021-03-22T16:22:30","date_gmt":"2021-03-22T13:22:30","guid":{"rendered":"https:\/\/www.susamuru.com.tr\/atik-su-aritma-tesisi-kapma-kepce-clamshell\/"},"modified":"2021-03-31T13:49:19","modified_gmt":"2021-03-31T10:49:19","slug":"scoop-clamshell","status":"publish","type":"page","link":"https:\/\/www.susamuru.com.tr\/en\/scoop-clamshell\/","title":{"rendered":"Scoop \/ Clamshell"},"content":{"rendered":"\t\t
As the capacity of Wastewater Treatment Plants has been increased over the past few years (the wastewater flow has grown), it has become a need to use a trash rake machine for the coarse screens<\/em><\/strong>just as in the hydroelectric power plants. It is mostly called and known as the clamshell or scoop or grab in the industry.<\/p>\n The machines designed by us are used to separate the coarse trash such as fabric pieces, sanitary products, hair, and wet wipes that get mixed into the sewer system.<\/p>\n 9 SUSAMURU machines have been installed and put into operation at \u0130SK\u0130 Atak\u00f6y Wastewater Treatment Plant Section II and 4 SUSAMURU machines have been installed and put into operation at \u0130SK\u0130 Tuzla Wastewater Treatment Plant.<\/p>\n The Atak\u00f6y Project has been completed by the guidance of Alkata\u015f and Deniz M\u00fchendislik companies, and Tuzla Project has been completed by the guidance of Alkata\u015f company. <\/p>\n The solutions of these two projects that have very different construction structures are also very different. In Atak\u00f6y Project especially, the bridge crossing that allows replacement of back-up machine on the roof has a remarkable design.<\/p>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t